Second Phase Expansion of Industrial Area Sewage Treatment Facility

Brief description

The project aims to upgrade the capacity in two stages:

(Phase 2A): The upgrade of the existing STF process capacity from 30,000m3/d to 60,000m3/d (average flow of raw sewage).

(Phase 2B): designed for a capacity of 30,000m3/d and consisted of a second separate treatment “train” adjacent to the existing facility.

Benefits

The Project comprised the design and construction of the upgrade to the existing Industrial Area Sewage Treatment Facility. The upgraded works were integrated completely into the operation of the existing works.

The second phase of expansion comprised  two stages. (Phase 2A) which  is for the upgrade of the existing STF process capacity from 30,000m3/d to 60,000m3/d (average flow of raw sewage), and (Phase 2B) which was designed for a capacity of 30,000m3/d and consisted of a second separate treatment “train” adjacent to the existing facility.

Project Information
Geographical Location N/A
Area Multiple Areas
Sector Drainage Projects
Total Cost 277,598,351 Q.R.
Status Complete
Type Drainage
Start Date 05 January 2015
Construction company

​SIX CONSTRUCT

Consulting company N/A